1) Measure the Area
- For outdoor cooling systems, measure all open sides of the area to be cooled.
- For Mistscaping, place nozzles in groups of 3 - 5 for a more dramatic effect. Designate the quantity of nozzles needed.
- For warehouse cooling or humidification applications, contact Customer Service
2) Divide by 10
Take the total area measured in step 1 and divide by 10. The result will be the number of 10 foot Kits that are needed to complete the system. Decide which tubing is preferred. Fogco offers Flexible Nylon, Rigid Copper, or Rigid Stainless Steel. .
3) Choose a Pump
The Fogco pump range includes the Promotional Series - 160 to 250 PSI; the Professional Direct Drive Series - 1000 PSI; and the Premium Pulley Drive Series - 1000 PSI. Review the capabilities of each pump range to determine which Series is best suited for the application. See the chart below for PSI and Flow Capacity specifications.
| Systems above 2 GPM may require ½" feed line. |
|
4) Include the Filter Starter Kit
The Fogco Filter Starter Kit is an all inclusive kit containing all the necessary accessories to connect the pump to the water supply on the low pressure side and to the fog line on the high pressure side. It is a requirement for all installations.
Do not use the Filter Starter Kit for systems above 3 GPM. Call Customer Service for assistance.
For larger systems, or if specific design assistance is needed, please contact our Technical Support Staff at info@fogco.com
|
For a complete Products Listing, System Design Assistance, or for additional information, contact our Technical Support Staff at info@fogco.com.
|
|